Union carbide s respond to the bhopal disaster

Category: Literature,
Published: 24.04.2020 | Words: 449 | Views: 782
Download now

Anatomy, Procedures Decision, Contingency Plan, Decision Making Process

Research from Article:

Decision-Making Process for Bhopal

Need help writing essays?
Free Essays
For only $5.90/page

Upon December a few, 1984, about 5, two hundred people were wiped out and at least 11, 500 more were injured when a plant in Bhopal, India operated by Union Carbide Indian Limited leaked remarkably toxic methylisocyanate (MIC) gas (Bhopal tragedy, 2016). In answer to this high-profile incident, several investigations which includes one simply by Jackson N. Browning (“The Browning Report”) highlighted the flawed decision-making process that resulted in this tragedy. To determine the facts, this kind of paper evaluations the literary works concerning the 1984 Bhopal catastrophe, followed by a great assessment with regards to the overall top quality of the decision making process employed by Union Carbide.

The framework of the decision making processes.

The main stakeholders active in the decision that resulted in the Bhopal gas leak included Union Carbide India Limited (UCIL) and its 23, 000 Indian investors, Union Carbide (which held more than 50% of the UCIL operation and also the 750, 1000 residents in the surrounding community of Bhopal, India (Browning, 1993). The manufacture of MIC is actually a highly complex and risky enterprise that was actually intended to give India will the ability to become self-sufficient in food production and the entire plant was operated simply by local American indian nationals within this self-sufficiency initiative (Browning, 1993). In fact , the last American worker on the Bhopal grow had departed more than two years prior to the 1984 disaster (Browning, 1993).

2 . The main stages or activities of the decision making process.

The investigations that followed the 1984 disaster showed that it was not the decision-making process of UCIL or perhaps Union Carbide that ended in this event, but rather a dissatisfied Of india employee of UCIL. In line with the Browning Report, “Although it was not known at that time, the gas was formed each time a disgruntled flower employee, seemingly bent about spoiling a batch of methyl isocyanate, added drinking water to a storage tank” (1993, p. 1). Consequently, a lot more salient aspects of the decision-making process that have been involved in this incident happened after the simple fact.

3. Examination of the case

To its credit, Union Carbide and UCIL had planned to get the unforeseen by creating contingency plans and problems response teams (Browning, 1993). Nevertheless, Sheoin and Pearce (2015) indicate the “disastrous response to the leak due to failures by the Indian point out and the dependable corporation” (p. 2) as contributing to the magnitude in the incident.

4. Assess the overall quality of the decision making procedure. Identify