Detailed Environmental Impact Evaluation (DEIA) is one of the procedures of EIA used in Malaysia. The DEIA report will be prepared following your Preliminary EIA was approved by the Section Of Environmental. Detailed EIA is a treatment undertaken for those projects with major or significant affects to the environment. The Procedure intended for Detailed EIA.

Figure 1 shows the process involved in DEIA

Need help writing essays?
Free Essays
For only $5.90/page

The in depth assessment requires EIA report display intended for the public and affected community to review. The instances of activities which will need to go through the Detailed EIA procedure will be listed in List 1 .

Notwithstanding the list in List you, the Representative General of Environment provides the prerogative to request reveal assessment of your project that has significant affects to the environment of projects which are positioned in or adjacent to environmentally sensitive areas. List of Prescribed Activities Which Need Detailed EIA

1 . Straightener and steel industry.

2 . Pulp and newspaper mills.

3. Bare cement plant.

4. Structure of coal fired power plant.

your five. Construction of dams pertaining to water supply and hydroelectric

power techniques.

6. Land reclamation.

six. Incineration grow (scheduled waste materials & sound wastes).

8. Structure of comunitario solid waste landfill center (including comunitario solid squander transfer station).

being unfaithful. Project concerning land removing where fifty percent of the location or more having slopes going above 25 deg (except quarry).

12. Logging covering up an area exceeding beyond 500 hectares or more.

11. Advancement tourist or perhaps recreational facilities on island destinations in around waters which can be gazetted as national underwater parks.

12. Development of restoration plant (off-site) for lead-acid battery waste products

13. Scheduled waste products recovery or treatment facility generating significant amount of wastewater which is located upstream of public water supply intake.

14. Non-ferrous ” Primary smelting.

List 1 reveals examples of actions that need DEIA

After the DEIA report being approved by the DOE approval, a paper advertisements is conducts for public’s comment. The DEIA survey could be acquired for any individual parties that interested with it. For example , a DEIA record could be bought with RM 1, 500. 00. Similar is opened for the general public view in a certain time period. After the duration for the public’s comments on the approved activities related with the DEIA report, the construction process can be started.

Approved Activity started out

DEIA modification prior to public’s comment

Paper advertisements for public’s comment

DEIA approved

Submitter of DEIA for endorsement

Planning of DEIA

PEIA approved

1